Drgem X Ray Service Manual Install Fixed Now
: Install a dedicated 3-phase, 380V/400V/480V line (or single-phase 220V for lower kW compact models).
Before installing, check what you received (CD, USB drive, or download link).
Secure the floor rails or ceiling mounts first. Use a spirit level to ensure the vertical column is perfectly upright. drgem x ray service manual install
Mount the vertical wall stand securely to a structural wall or dedicated floor support frames. Ensure the vertical movement mechanism travels smoothly without binding. X-ray Tube and Collimator Integration
: Center the 4-way floating tabletop relative to the longitudinal travel of the tube stand. : Install a dedicated 3-phase, 380V/400V/480V line (or
For systems with errors E04 and E05, experienced technicians have identified likely culprits:
Assemble the X-ray and DR I/O terminal blocks, ensuring specific configurations for the tube brand being used (e.g., Toshiba tubes). 4. Software Configuration and Calibration Once powered on, the system enters the service phase: Use a spirit level to ensure the vertical
The assembly process follows a sequential flow to ensure mechanical stability:
Section 2: Unpacking, Hardware Assembly, and Mechanical Installation
: Route high-voltage cables through the overhead cable management arm, avoiding tight bends. Radiographic Table and Bucky Wall Stand
Ensure the incoming power meets the specifications (usually 3-phase, 380-480VAC for GXR series) and that the facility has a solid grounding system (< 2 Ω).
